project

Structural Steel Fabrication & Erection — Hasht Behesht Hotel, Kish Island

Hasht Behesht Hotel is featured in this ASAECO project record. The project, “Structural Steel Fabrication & Erection — Hasht Behesht Hotel, Kish Island”, is presented with its recorded scope, client information and construction photographs. These details help prospective clients identify relevant experience and prepare a brief for comparable steel fabrication or installation work.

Hasht Behesht Hotel — scope and context

The structural steel project for Hasht Behesht Hotel on Kish Island was completed by ASAECO in 2014 under the direct supervision of the client.

Due to the coastal climate and high humidity of the Kish Free Zone, the project required careful selection of durable materials, precise welding procedures, and the proper application of protective coating systems to enhance the corrosion resistance of the steel structure.

The scope of work included precision cutting of structural components, fabrication of steel beams and columns, workshop assembly, and complete on-site erection of the structural steel frame.

By following applicable building standards and strict quality requirements, ASAECO delivered a safe, stable, and durable structural steel system suitable for hotel use.

The project was successfully completed within an eight-month contract period and delivered to the client according to the approved schedule.

A structural steel enquiry starts with architectural and structural drawings, the building use, connection details and the intended erection scope. The fabrication package should identify member schedules, drawing revisions and interfaces with other trades. Site access, delivery restrictions and available assembly space also affect planning. Separating material supply, workshop fabrication, protective treatment and site erection helps establish a clear basis for a project proposal.

Hasht Behesht Hotel project record

The recorded location is Kish Island, Iran. The client is Hasht Behesht Hotel, Kish, with supervision listed as Client. The project record gives 2014 as the completion year or project period and 8 Months as the contract duration. Read these details alongside the scope and services below to understand ASAECO’s role in this particular assignment. The photographs provide a visual reference for the documented project.

Hasht Behesht Hotel project questions

Who was the client for this project?

The client recorded for the Hasht Behesht Hotel project is Hasht Behesht Hotel, Kish. The project information also identifies the supervision team and contractor. Together with the location and scope description, these entries provide the context for reviewing this example of ASAECO’s work.

What was the recorded contract duration?

The contract duration is listed as 8 Months. A new project requires its own programme based on drawing availability, quantities, material supply and site conditions. When preparing an enquiry, include the required delivery date and the expected readiness of the installation area so that the proposed sequence can be reviewed.

Discuss a project similar to Hasht Behesht Hotel

Send ASAECO the available drawings, project location, intended use and required delivery date. State whether the enquiry covers workshop fabrication, site installation or both. Where available, include a component schedule and an initial quantity estimate. Identifying these items at the outset helps define the proposed services and the information still needed for a detailed review.

The initial technical discussion can also address interfaces with other contractors, transport routes, assembly areas and facilities at the site. Identify materials or equipment supplied by the client, required inspection arrangements and expected handover documents. A clear record of these responsibilities helps establish a practical basis for reviewing the work package and preparing a proposal.

For the related capability, see Building Steel Structure Design, Fabrication and Installation. To discuss a new requirement, contact ASAECO and mention the Hasht Behesht Hotel project. Referencing this example helps explain the type of work you have in mind; your own drawings and specifications will define the scope of the new assignment.

For general background on steel in construction, the World Steel Association’s constructsteel programme provides industry information. This external resource complements the project examples by explaining broader applications of steel in the built environment. Project requirements should be reviewed using the documents supplied for the specific enquiry.

Services delivered — Hasht Behesht Hotel

  • Fabrication of the structural steel frame using standard-compliant materials suitable for the humid climate of Kish Island
  • Precision CNC cutting of steel beams and structural sections
  • Specialized welding in accordance with applicable building standards and WPS / PQR requirements
  • Complete workshop assembly of structural components
  • On-site erection of the steel structure and application of anti-corrosion protective coatings
  • Quality control and technical inspections throughout all project stages
  • Preparation and delivery of As-Built drawings and technical documentation
  • Full coordination with the client's supervision team