Crane Runway Systems: Girder Fabrication and Rail Alignment
Crane runway systems support travelling overhead cranes and transfer wheel loads to the building supports. ASAECO provides runway girder fabrication, installation and rail alignment based on the crane data and the structural drawings. Rated lifting capacity alone is insufficient for defining the runway: wheel loads, wheel spacing, girder spans and operating conditions must also be reviewed.
Coordinating the crane supplier and building designer helps define a practical scope before fabrication begins.
Service scope
- Review crane wheel loads and runway spans
- Detail girders, stiffeners and supporting connections
- Fabricate and inspect runway components
- Install girders and check bearing locations
- Align rails and document geometric checks

Design inputs for crane runway systems
The crane supplier’s data should be reviewed alongside the building drawings. Maximum wheel loads, wheel spacing, horizontal actions, operating duty and the distances between columns influence the runway design. Multiple cranes sharing a runway and any planned future equipment must be identified. For an existing building, the columns, brackets and connections require a capacity review before additional loads are introduced.
Establishing the design responsibilities early avoids a gap between the crane package and the supporting building structure.
Girder fabrication and quality control
Approved drawings define the member geometry, stiffeners, connections and support details. During manufacture, inspections address dimensions, alignment and welding requirements. The extent of weld testing and the required quality records should be agreed in the technical specification. Runway components benefit from clear identification so deliveries can follow the erection sequence. Connection access and the practical method of positioning the members should be considered before production.
These preparations help reduce avoidable site adjustments and clarify the checks needed before the girders are released for delivery.
Installation and rail alignment
Before erecting crane runway systems, the team checks the supporting levels and bearing positions. Rail elevation, straightness and gauge must be controlled against the project tolerances. Rail clips, joints, end details and stops need coordination with the crane arrangement. Poor travel behaviour may involve the runway as well as the crane itself, so checking only the moving equipment is insufficient. Survey records and any corrective work should be documented.
Final testing and handover are coordinated with the crane supplier within the agreed contract scope.
Runway fabrication and installation costs
Costs depend on girder weight, spans, section type, stiffeners, finish and total runway length. Rail supply, fixing components and access equipment should be identified separately when comparing quotations. Working within an operating factory may add restrictions on working hours, lifting positions and shutdown periods. A useful enquiry distinguishes steel fabrication, transport, erection and rail installation.
ASAECO reviews the drawings and site conditions to identify the required activities, exclusions and information still needed before preparing a project-specific estimate.
Frequently asked questions about crane runway systems
Is rated crane capacity enough for a quote?
No. Include wheel loads, wheel spacing, runway length, support spans and building drawings. The crane supplier normally provides the equipment data required by the structural designer.
Can a runway be added to an existing hall?
Potentially, subject to checking the building capacity, supporting brackets, geometry and erection access. Existing columns and connections must be assessed for the proposed crane actions before a solution is accepted.
What is checked during rail installation?
Typical checks include rail level, alignment, gauge and fixing condition. Acceptance tolerances and required survey records should be specified for the particular crane and project.
Request a crane runway systems project review
Send the available drawings and specifications with the project location and required programme. The initial review identifies dimensions, quantities or tonnage, the design status and the services required. Where information is preliminary, the estimate should state its assumptions and identify the additional documents needed for a firm proposal.
The quotation for crane runway systems should identify supplied items, site activities and the responsibilities for transport, installation and quality control. Confirm the current drawing revision and any order changes before fabrication starts. This helps align the production schedule with the actual project requirements and gives both parties a clear reference for reviewing the completed scope.
Contact ASAECO for a project review | View ASAECO projects
Related services
- Crane Systems: Single-Girder, Double-Girder and Gantry
- Industrial Steel Buildings, Warehouses and Workshops
Further technical reading: AISC structural steel engineering resources. The approved project drawings and specification govern the work.
Fabrication & Erection of Industrial Steel Building and Overhead Crane Systems
ASAECO Projects, Steel Structure Construction
Structural Steel Fabrication & Erection — Arghavanieh, Isfahan
ASAECO Projects, Steel Structure Construction
Structural Steel Fabrication & Erection — Azar Street, Isfahan
ASAECO Projects, Steel Structure Construction
Structural Steel Fabrication & Erection — Saadat Abad / Molla Sadra, Isfahan
ASAECO Projects, Steel Structure Construction
Structural Steel Fabrication & Erection — Parsian Clinic, Mir Street, Isfahan
ASAECO Projects, Steel Structure Construction