Structural Steel Fabrication for Fuel Storage Tanks — Isfahan Refinery
Isfahan Refinery is featured in this ASAECO project record. The project, “Structural Steel Fabrication for Fuel Storage Tanks — Isfahan Refinery”, is presented with its recorded scope, client information and construction photographs. These details help prospective clients identify relevant experience and prepare a brief for comparable steel fabrication or installation work.
On this page
Isfahan Refinery — scope and context
The structural steel fabrication project for fuel storage tanks at Isfahan Refinery was executed by ASAECO for Nir Pars Company under the supervision of MAPNA.
Due to the critical nature of fuel storage and the stringent safety requirements of refinery operations, the tank support structures required a high level of engineering accuracy, suitable material selection, controlled welding procedures, and multi-stage quality inspection.
The scope of work included precision cutting of steel plates and structural sections, fabrication of the main tank support structures, execution of welded connections in accordance with refinery requirements, detailed weld inspection, workshop assembly, and final on-site installation at Isfahan Refinery.
The project was completed within a three-month contract period in accordance with applicable technical requirements, HSE procedures, and MAPNA's inspection and supervision requirements.
Industrial steelwork enquiries should include reference drawings and clear supply boundaries. Component dimensions, interfaces, transport limits and assembly requirements are relevant to defining the work package. Fabrication, assembly, protective treatment and installation should be stated separately where different parties are responsible. Inspection requirements and handover documents should accompany the technical information so that the proposal can be reviewed against an agreed scope.
Isfahan Refinery project record
The recorded location is Isfahan Refinery, Iran. The client is Nir Pars Company, with supervision listed as MAPNA. The project record gives 2009–2010 as the completion year or project period and 3 Months as the contract duration. Read these details alongside the scope and services below to understand ASAECO’s role in this particular assignment. The photographs provide a visual reference for the documented project.
Isfahan Refinery project questions
Who was the client for this project?
The client recorded for the Isfahan Refinery project is Nir Pars Company. The project information also identifies the supervision team and contractor. Together with the location and scope description, these entries provide the context for reviewing this example of ASAECO’s work.
What was the recorded contract duration?
The contract duration is listed as 3 Months. A new project requires its own programme based on drawing availability, quantities, material supply and site conditions. When preparing an enquiry, include the required delivery date and the expected readiness of the installation area so that the proposed sequence can be reviewed.
Discuss a project similar to Isfahan Refinery
Send ASAECO the available drawings, project location, intended use and required delivery date. State whether the enquiry covers workshop fabrication, site installation or both. Where available, include a component schedule and an initial quantity estimate. Identifying these items at the outset helps define the proposed services and the information still needed for a detailed review.
The initial technical discussion can also address interfaces with other contractors, transport routes, assembly areas and facilities at the site. Identify materials or equipment supplied by the client, required inspection arrangements and expected handover documents. A clear record of these responsibilities helps establish a practical basis for reviewing the work package and preparing a proposal.
For the related capability, see Design, Fabrication & Erection of Building and Industrial Steel Structures with Fully Bolted Connections. To discuss a new requirement, contact ASAECO and mention the Isfahan Refinery project. Referencing this example helps explain the type of work you have in mind; your own drawings and specifications will define the scope of the new assignment.
For general background on steel in construction, the World Steel Association’s constructsteel programme provides industry information. This external resource complements the project examples by explaining broader applications of steel in the built environment. Project requirements should be reviewed using the documents supplied for the specific enquiry.
Project gallery — Isfahan Refinery
- Project Location: Isfahan Refinery, Iran
- Client: Nir Pars Company
- Project Supervision: MAPNA
- Project Period: 2009–2010
- Contract Duration: 3 Months
- Contractor: ASAECO — Arman Sanat Asia Engineering Company
Services delivered — Isfahan Refinery
- Engineering and fabrication of structural steel for fuel storage tanks
- Precision CNC cutting of steel plates and structural sections
- Fabrication of primary tank structures and supporting steelwork
- Specialized welding in accordance with WPS / PQR requirements and refinery standards
- Quality control inspections including VT and PT
- Complete workshop assembly and preparation of structural components for installation
- On-site structural steel installation at Isfahan Refinery
- Preparation of As-Built drawings and quality control documentation
- Full coordination with MAPNA and Nir Pars technical teams