project

Structural Steel Fabrication for the Main Building and Boiler Roofs of Units 1 & 2 — Tavazon Thermal Power Plant, Isfahan Steel

Tavazon Thermal Power Plant is featured in this ASAECO project record. The project, “Structural Steel Fabrication for the Main Building and Boiler Roofs of Units 1 & 2 — Tavazon Thermal Power Plant, Isfahan Steel”, is presented with its recorded scope, client information and construction photographs. These details help prospective clients identify relevant experience and prepare a brief for comparable steel fabrication or installation work.

Tavazon Thermal Power Plant — scope and context

The structural steel fabrication project for the main building and boiler roofs of Units 1 and 2 at the Tavazon Thermal Power Plant, Isfahan Steel, was executed by ASAECO for Mabna Company under the supervision of Moshanir.

Due to the direct integration of the steel structures with power plant boiler systems and the need to withstand heavy equipment loads, thermal vibration, lateral loads, and demanding operating conditions, the project required precise structural engineering, high-accuracy fabrication, and strict control of structural connections.

The scope of work included fabrication of heavy boiler support structures, precision cutting, specialized welding, multi-stage quality control, workshop assembly, and complete on-site erection of the steel structures.

Compliance with power plant requirements, Moshanir's technical instructions, and stringent safety procedures was a key aspect of the project.

The work was completed within an eight-month contract period and delivered in accordance with the required quality standards.

Power plant steelwork requires a clear record of equipment interfaces, installation locations and responsibilities across contractors. An enquiry should identify drawing numbers and revisions, the intended work packages and the boundaries between equipment supply and supporting steelwork. Delivery sequencing needs coordination with the installation programme. Inspection requirements, handover documents and site access arrangements should also be identified during the initial review.

Tavazon Thermal Power Plant project record

The recorded location is Tavazon Thermal Power Plant, Isfahan Steel, Iran. The client is Mabna Company, with supervision listed as Moshanir Company. The project record gives 2008–2009 as the completion year or project period and 8 Months as the contract duration. Read these details alongside the scope and services below to understand ASAECO’s role in this particular assignment. The photographs provide a visual reference for the documented project.

Tavazon Thermal Power Plant project questions

Who was the client for this project?

The client recorded for the Tavazon Thermal Power Plant project is Mabna Company. The project information also identifies the supervision team and contractor. Together with the location and scope description, these entries provide the context for reviewing this example of ASAECO’s work.

What was the recorded contract duration?

The contract duration is listed as 8 Months. A new project requires its own programme based on drawing availability, quantities, material supply and site conditions. When preparing an enquiry, include the required delivery date and the expected readiness of the installation area so that the proposed sequence can be reviewed.

Discuss a project similar to Tavazon Thermal Power Plant

Send ASAECO the available drawings, project location, intended use and required delivery date. State whether the enquiry covers workshop fabrication, site installation or both. Where available, include a component schedule and an initial quantity estimate. Identifying these items at the outset helps define the proposed services and the information still needed for a detailed review.

The initial technical discussion can also address interfaces with other contractors, transport routes, assembly areas and facilities at the site. Identify materials or equipment supplied by the client, required inspection arrangements and expected handover documents. A clear record of these responsibilities helps establish a practical basis for reviewing the work package and preparing a proposal.

For the related capability, see Design, Fabrication & Erection of Building and Industrial Steel Structures with Fully Bolted Connections. To discuss a new requirement, contact ASAECO and mention the Tavazon Thermal Power Plant project. Referencing this example helps explain the type of work you have in mind; your own drawings and specifications will define the scope of the new assignment.

For general background on steel in construction, the World Steel Association’s constructsteel programme provides industry information. This external resource complements the project examples by explaining broader applications of steel in the built environment. Project requirements should be reviewed using the documents supplied for the specific enquiry.

Services delivered — Tavazon Thermal Power Plant

  • Engineering and fabrication of heavy boiler structures and the main power plant building
  • Structural calculations and preparation of shop drawings
  • Precision CNC cutting of steel plates and structural sections
  • Fabrication of steel structures designed for thermal effects and equipment-induced vibration
  • Specialized Submerged Arc Welding (SAW) and electrode welding in accordance with WPS / PQR requirements
  • Quality control inspections including VT and PT
  • Workshop assembly and preparation of components for transportation
  • Complete on-site erection at the Tavazon Thermal Power Plant
  • Preparation of As-Built drawings, QC reports, and technical documentation
  • Full coordination with Moshanir and the client's technical team